One Palace street

Lintel replacement on the 1,2,3, and 4 floors while work continued below.

7.5m steel beams fixed to the steel support system, projected out of the windows by two meters at first-floor level, Designed and installed by Bishop Developments, A fully working scaffold erected off of the beams to allow the lintel replacement and the groundworks to run concurrent, saving valuable time for the project. £1.2m

A selection of pictures from this project